Water - Inside Town limits water/sewer/garbage pickup is provided and billed monthly on a single statement.
Outside Town limits only water is available in some close-by locations. These services are not available from Monroe County and must be provided by private contractors where needed.
Town fees (pay at City Hall): Existing service - $50 nonrefundable connection fee.
New construction - (Fill out no-cost application at City Hall to determine availability of services to your location.)
Inside Town limits: $450 meter tap fee for water and $450 sewer connection fee.
Outside Town limits: $500 meter tap fee for water only.
Sewer - (See Water section above for Town services inside Town limits) Outside Town limits you will need to provide your own septic system. Contact the Environmental Division of the Monroe County Health Department (in the office 8-9 AM, then out in the field the rest of the day). Hereâs how it works: When youâre ready for construction, fill out the application at the Courthouse Annex and pay the $250 fee. Within 5-10 working days the Environmentalist will visit the site and may require a soil evaluation (may be another $200 fee for soil testing, mapping, etc.). When the Environmentalist is satisfied, he/she will issue a permit describing the required system. You must obtain a licensed installer to construct the system according to the Permit and notify the Environmentalist when work is completed. The Environmentalist will inspect and issue a Certificate of Completion. For new construction, the electrical inspector must have a copy of the Cert. of Completion before he will allow the final elect. turn-on (State Law).
Electricity - Provided by Fort Loudoun Electric Cooperative ( http://flec.org ) throughout Monroe County. A temporary power pole may be purchased from a private contractor for use during construction. An initial fee of $5 for cooperative membership will be collected when you sign up for service. Electric Permits are required for Temporary, Rough-in, and Final inspections. Fees are based on the required service amperage: 0-200 will cost you $32, 201-400 $45, and 401-600 $55 for each inspection. The Permits may be purchased locally at Yates Home Store and Tallent Hardware, as well as Wholesale Supply and Sloan Center in Madisonville. The Permits must be purchased in person by either the owner or a licensed contractor in the employ of the owner.
Fort Loudoun Electric Cooperative
116 Tellico Port Rd., Vonore, TN 37885
Garbage Collection - See Water section above for Town services inside Town limits
Outside of Town limits you will need to hire a private contractor to collect garbage, or carry it yourself to one of the free collection centers (see below).
Monroe County Convenience (garbage) Centers, Mon-Fri 8am-5pm, Sat 8am-12noon â No cost to residents
Tellico Plains Convenience Center
8825 Highway 68
Tellico Plains, TN 37385
Phone
Recyclables: Newspaper, Cardboard, #1 and #2 Plastic, Steel Cans, Aluminum Cans, Glass, Metal
Madisonville Convenience Center
288 Industrial Park Road
Madisonville, TN 37354
Phone
Recyclables: Newspaper, Cardboard, #1 & #2 Plastic, Steel Cans, Aluminum Cans, Aluminum Cans, Glass, Clothing,
Little Notchey Creek Conv. Center
570 Little Notchey Road
Madisonville, TN 37354
Phone
Recyclables: Tires, Appliances
Vonore Transfer Station, Mon-Fri7am-4pm, Sat 8am-12noon
Niles Ferry Industrial Park
Tellico Port Road
Vonore, TN 37885
Recyclables: Newspaper, Cardboard, #1 & #2 Plastic, Glass, Aluminum Cans, Steel Cans
|